Cost allocation in rescheduling with machine unavailable period (Q1754051): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2017.09.015 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2755352063 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine flow-time scheduling with a single breakdown / rank
 
Normal rank
Property / cites work
 
Property / cites work: Supply chain scheduling: sequence coordination / rank
 
Normal rank
Property / cites work
 
Property / cites work: Executing production schedules in the face of uncertainties: a review and some future directions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Matchup Scheduling with Multiple Resources, Release Dates and Disruptions / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the convexity of games corresponding to sequencing situations with due dates. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Coordination of Outsourced Operations at a Third-Party Facility Subject to Booking, Overtime, and Tardiness Costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing games / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing and Cooperation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3254699 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Capacity Allocation and Scheduling in Supply Chains / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rescheduling for Multiple New Orders / rank
 
Normal rank
Property / cites work
 
Property / cites work: Generating Experimental Data for Computational Testing with Machine Scheduling Applications / rank
 
Normal rank
Property / cites work
 
Property / cites work: Supply Chain Scheduling: Batching and Delivery / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rescheduling for New Orders / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rescheduling for Job Unavailability / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing total weighted completion time with an unexpected machine unavailable interval / rank
 
Normal rank
Property / cites work
 
Property / cites work: Worst-case analysis of the WSPT and MWSPT rules for single machine scheduling with one planned setup period / rank
 
Normal rank
Property / cites work
 
Property / cites work: Machine scheduling with an availability constraint / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine flow-time scheduling with scheduled maintenance / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rescheduling for machine disruption to minimize makespan and maximum lateness / rank
 
Normal rank
Property / cites work
 
Property / cites work: A characterization of the Shapley value in queueing problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Supply chain scheduling: Just-in-time environment / rank
 
Normal rank
Property / cites work
 
Property / cites work: Coordination in a two-stage production system: complexity, conflict and cooperation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Approximation Algorithms for the Supplier's Supply Chain Scheduling Problem to Minimize Delivery and Inventory Holding Costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5817870 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Relaxed sequencing games have a nonempty core / rank
 
Normal rank
Property / cites work
 
Property / cites work: Approximation algorithms for minimizing the total weighted number of late jobs with late deliveries in two-level supply chains / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rescheduling on a single machine with part-type dependent setup times and deadlines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4660472 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rescheduling with release dates to minimize makespan under a limit on the maximum sequence disruption / rank
 
Normal rank

Latest revision as of 17:26, 15 July 2024

scientific article
Language Label Description Also known as
English
Cost allocation in rescheduling with machine unavailable period
scientific article

    Statements

    Cost allocation in rescheduling with machine unavailable period (English)
    0 references
    0 references
    0 references
    0 references
    30 May 2018
    0 references
    scheduling
    0 references
    rescheduling
    0 references
    machine unavailability
    0 references
    sequencing game
    0 references
    core
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references

    Identifiers