Cost allocation in rescheduling with machine unavailable period
From MaRDI portal
Publication:1754051
DOI10.1016/j.ejor.2017.09.015zbMath1403.90346OpenAlexW2755352063MaRDI QIDQ1754051
Xiangtong Qi, Liang Lu, Zhixin Liu
Publication date: 30 May 2018
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2017.09.015
Cooperative games (91A12) Applications of game theory (91A80) Deterministic scheduling theory in operations research (90B35)
Related Items (7)
A cooperative approach to service booking and scheduling in cloud manufacturing ⋮ A tardiness-augmented approximation scheme for rejection-allowed multiprocessor rescheduling ⋮ Mixed batch scheduling on identical machines ⋮ Approximation scheme for single-machine rescheduling with job delay and rejection ⋮ Sequencing situations and games with non-linear cost functions under optimal order consistency ⋮ On interactive sequencing situations with exponential cost functions ⋮ Rescheduling due to machine disruption to minimize the total weighted completion time
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Minimizing total weighted completion time with an unexpected machine unavailable interval
- Rescheduling for machine disruption to minimize makespan and maximum lateness
- Single machine flow-time scheduling with scheduled maintenance
- Rescheduling with release dates to minimize makespan under a limit on the maximum sequence disruption
- Supply chain scheduling: Just-in-time environment
- Single machine flow-time scheduling with a single breakdown
- Sequencing games
- Rescheduling on a single machine with part-type dependent setup times and deadlines
- Coordination in a two-stage production system: complexity, conflict and cooperation
- A characterization of the Shapley value in queueing problems
- Executing production schedules in the face of uncertainties: a review and some future directions
- Approximation algorithms for minimizing the total weighted number of late jobs with late deliveries in two-level supply chains
- Supply chain scheduling: sequence coordination
- Worst-case analysis of the WSPT and MWSPT rules for single machine scheduling with one planned setup period
- Machine scheduling with an availability constraint
- Rescheduling for Multiple New Orders
- Rescheduling for Job Unavailability
- Capacity Allocation and Scheduling in Supply Chains
- Generating Experimental Data for Computational Testing with Machine Scheduling Applications
- Supply Chain Scheduling: Batching and Delivery
- Rescheduling for New Orders
- Matchup Scheduling with Multiple Resources, Release Dates and Disruptions
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Sequencing and Cooperation
- Coordination of Outsourced Operations at a Third-Party Facility Subject to Booking, Overtime, and Tardiness Costs
- Approximation Algorithms for the Supplier's Supply Chain Scheduling Problem to Minimize Delivery and Inventory Holding Costs
- Relaxed sequencing games have a nonempty core
- Scheduling
- On the convexity of games corresponding to sequencing situations with due dates.
This page was built for publication: Cost allocation in rescheduling with machine unavailable period