A three-stage optimization algorithm for the stochastic parallel machine scheduling problem with adjustable production rates (Q1956018): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1155/2013/280560 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2083854917 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing makespan for two parallel machines with job limit on each availability interval / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fifty years of scheduling: a survey of milestones / rank
 
Normal rank
Property / cites work
 
Property / cites work: Dominance rules for the parallel machine total weighted tardiness scheduling problem with release dates / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimization of maximum lateness on parallel machines with sequence-dependent setup times and job release dates / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3425131 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Alternative algorithms for the optimization of a simulation model of a multimodal container terminal / rank
 
Normal rank
Property / cites work
 
Property / cites work: SIMULATION-BASED PORTFOLIO OPTIMIZATION FOR LARGE PORTFOLIOS WITH TRANSACTION COSTS / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simulation-Based Optimization of Virtual Nesting Controls for Network Revenue Management / rank
 
Normal rank
Property / cites work
 
Property / cites work: On Choosing Parameters in Retrospective-Approximation Algorithms for Stochastic Root Finding and Simulation Optimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: Robust Optimization for Unconstrained Simulation-Based Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Simulation Optimization Approach to Long-Term Care Capacity Planning / rank
 
Normal rank
Property / cites work
 
Property / cites work: Ordinal optimization of DEDS / rank
 
Normal rank
Property / cites work
 
Property / cites work: Differential evolution -- a simple and efficient heuristic for global optimization over continuous spaces / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling flow shops using differential evolution algorithm / rank
 
Normal rank
Property / cites work
 
Property / cites work: A novel hybrid discrete differential evolution algorithm for blocking flow shop scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Ordinal Optimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of priority rule-based scheduling / rank
 
Normal rank

Latest revision as of 12:12, 6 July 2024

scientific article
Language Label Description Also known as
English
A three-stage optimization algorithm for the stochastic parallel machine scheduling problem with adjustable production rates
scientific article

    Statements

    A three-stage optimization algorithm for the stochastic parallel machine scheduling problem with adjustable production rates (English)
    0 references
    0 references
    13 June 2013
    0 references
    Summary: We consider a parallel machine scheduling problem with random processing/setup times and adjustable production rates. The objective functions to be minimized consist of two parts; the first part is related with the due date performance (i.e., the tardiness of the jobs), while the second part is related with the setting of machine speeds. Therefore, the decision variables include both the production schedule (sequences of jobs) and the production rate of each machine. The optimization process, however, is significantly complicated by the stochastic factors in the manufacturing system. To address the difficulty, a simulation-based three-stage optimization framework is presented in this paper for high-quality robust solutions to the integrated scheduling problem. The first stage (crude optimization) is featured by the ordinal optimization theory, the second stage (finer optimization) is implemented with a metaheuristic called differential evolution, and the third stage (fine-tuning) is characterized by a perturbation-based local search. Finally, computational experiments are conducted to verify the effectiveness of the proposed approach. Sensitivity analysis and practical implications are also discussed.
    0 references
    0 references
    0 references

    Identifiers