Scheduling multistage hybrid flowshops with multiprocessor tasks by an effective heuristic (Q3055403): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/00207540701871085 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1976237921 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A computational study of heuristics for two-stage flexible flowshops / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling a two-stage hybrid flow shop with parallel machines at the first stage / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hybrid flow-shop scheduling problems with multiprocessor task systems. / rank
 
Normal rank
Property / cites work
 
Property / cites work: A multi-stage parallel-processor flowshop problem with minimum flowtime / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4424549 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiprocessor task scheduling in multistage hybrid flow-shops: a genetic algorithm approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiprocessor task scheduling in multistage hybrid flow-shops: an ant colony system approach / rank
 
Normal rank

Latest revision as of 10:15, 3 July 2024

scientific article
Language Label Description Also known as
English
Scheduling multistage hybrid flowshops with multiprocessor tasks by an effective heuristic
scientific article

    Statements

    Identifiers