Robust scheduling for berth allocation and quay crane assignment problem (Q1719234): Difference between revisions

From MaRDI portal
Created claim: Wikidata QID (P12): Q59069817, #quickstatements; #temporary_batch_1709732266787
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1155/2014/834927 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2114653571 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Operations research at container terminals: a literature update / rank
 
Normal rank
Property / cites work
 
Property / cites work: The berth planning problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of berth allocation and quay crane scheduling problems in container terminals / rank
 
Normal rank
Property / cites work
 
Property / cites work: A scheduling method for Berth and Quay cranes / rank
 
Normal rank
Property / cites work
 
Property / cites work: Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities / rank
 
Normal rank
Property / cites work
 
Property / cites work: Robust cyclic berth planning of container vessels / rank
 
Normal rank
Property / cites work
 
Property / cites work: A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Robust berth scheduling with uncertain vessel delay and handling time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hybrid metaheuristics. An emerging approach to optimization. / rank
 
Normal rank

Latest revision as of 02:42, 18 July 2024

scientific article
Language Label Description Also known as
English
Robust scheduling for berth allocation and quay crane assignment problem
scientific article

    Statements

    Robust scheduling for berth allocation and quay crane assignment problem (English)
    0 references
    0 references
    0 references
    0 references
    8 February 2019
    0 references
    Summary: Decision makers must face the dynamism and uncertainty of real-world environments when they need to solve the scheduling problems. Different incidences or breakdowns, for example, initial data could change or some resources could become unavailable, may eventually cause the infeasibility of the obtained schedule. To overcome this issue, a robust model and a proactive approach are presented for scheduling problems without any previous knowledge about incidences. This paper is based on proportionally distributing operational buffers among the tasks. In this paper, we consider the berth allocation problem and the quay crane assignment problem as a representative example of scheduling problems. The dynamism and uncertainty are managed by assessing the robustness of the schedules. The robustness is introduced by means of operational buffer times to absorb those unknown incidences or breakdowns. Therefore, this problem becomes a multiobjective combinatorial optimization problem that aims to minimize the total service time, to maximize the buffer times, and to minimize the standard deviation of the buffer times. To this end, a mathematical model and a new hybrid multiobjective metaheuristic is presented and compared with two well-known multiobjective genetic algorithms: NSGAII and SPEA2+.