Economic scheduling of products with \(N\) components on a single machine (Q1278534): Difference between revisions
From MaRDI portal
Set OpenAlex properties. |
ReferenceBot (talk | contribs) Changed an Item |
||
Property / cites work | |||
Property / cites work: Optimal Scheduling of Products with Two Subassemblies on a Single Machine / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Batching to Minimize Flow Times on One Machine / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: The Economic Lot Scheduling Problem (ELSP): Review and Extensions / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Optimal Manufacturing of a Two Product Mix / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: One-pass batching algorithms for the one-machine problem / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Batching in single operation manufacturing systems / rank | |||
Normal rank |
Latest revision as of 18:34, 28 May 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Economic scheduling of products with \(N\) components on a single machine |
scientific article |
Statements
Economic scheduling of products with \(N\) components on a single machine (English)
0 references
5 August 1999
0 references
single machine scheduling
0 references
heuristic batching and sequencing algorithm
0 references
0 references