A Two-Stage Flexible Flowshop Problem with Deterioration (Q3511377): Difference between revisions
From MaRDI portal
Set OpenAlex properties. |
ReferenceBot (talk | contribs) Changed an Item |
||
Property / cites work | |||
Property / cites work: Batching and Scheduling Jobs on Batch and Discrete Processors / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A concise survey of scheduling with time-dependent processing times / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q4198056 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Minimizing sum of completion times for batch scheduling of jobs with deteriorating processing times / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q3525910 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A hybrid three-stage flowshop problem: Efficient heuristics to minimize makespan / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Minimizing makespan in a two-machine flowshop with dynamic arrivals allowed / rank | |||
Normal rank |
Latest revision as of 13:13, 28 June 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | A Two-Stage Flexible Flowshop Problem with Deterioration |
scientific article |
Statements
A Two-Stage Flexible Flowshop Problem with Deterioration (English)
0 references
10 July 2008
0 references
0 references