Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case (Q864823): Difference between revisions

From MaRDI portal
ReferenceBot (talk | contribs)
Changed an Item
Import241208061232 (talk | contribs)
Normalize DOI.
 
Property / DOI
 
Property / DOI: 10.1016/j.amc.2006.05.106 / rank
Normal rank
 
Property / DOI
 
Property / DOI: 10.1016/J.AMC.2006.05.106 / rank
 
Normal rank

Latest revision as of 06:01, 10 December 2024

scientific article
Language Label Description Also known as
English
Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case
scientific article

    Statements

    Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case (English)
    0 references
    0 references
    13 February 2007
    0 references
    flexible flow line
    0 references
    lot scheduling
    0 references
    metaheuristics
    0 references
    finite horizon
    0 references
    limited intermediate buffers
    0 references

    Identifiers