Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns (Q869601): Difference between revisions
From MaRDI portal
ReferenceBot (talk | contribs) Changed an Item |
Normalize DOI. |
||
Property / DOI | |||
Property / DOI: 10.1016/j.ejor.2006.05.005 / rank | |||
Property / DOI | |||
Property / DOI: 10.1016/J.EJOR.2006.05.005 / rank | |||
Normal rank |
Latest revision as of 06:15, 10 December 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns |
scientific article |
Statements
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns (English)
0 references
8 March 2007
0 references
inventory
0 references
machine breakdown
0 references
production run time
0 references
defective rate
0 references
rework
0 references
0 references
0 references
0 references
0 references