Relevant timed schedules/clock vectors for constructing time Petri net reachability graphs (Q539486): Difference between revisions

From MaRDI portal
ReferenceBot (talk | contribs)
Changed an Item
Import241208061232 (talk | contribs)
Normalize DOI.
 
(One intermediate revision by one other user not shown)
Property / DOI
 
Property / DOI: 10.1007/s10626-011-0100-4 / rank
Normal rank
 
Property / DOI
 
Property / DOI: 10.1007/S10626-011-0100-4 / rank
 
Normal rank

Latest revision as of 20:51, 9 December 2024

scientific article
Language Label Description Also known as
English
Relevant timed schedules/clock vectors for constructing time Petri net reachability graphs
scientific article

    Statements

    Relevant timed schedules/clock vectors for constructing time Petri net reachability graphs (English)
    0 references
    0 references
    0 references
    30 May 2011
    0 references
    The authors consider Petri nets (the TPN model). Their main result is the following: ``Only some timed schedules/clock vectors (one per enabled transition) of the clock/firing domains are relevant to construct reachability graphs for the TPN''. Resulting graphs are smaller then reachability graphs proposed in literature before. The article contains some illustrative examples.
    0 references
    Petri nets
    0 references
    TPN model
    0 references
    reachability graphs
    0 references

    Identifiers