A two-stage flow shop scheduling problem with transportation considerations (Q904289): Difference between revisions
From MaRDI portal
ReferenceBot (talk | contribs) Changed an Item |
Normalize DOI. |
||
Property / DOI | |||
Property / DOI: 10.1007/s10288-015-0297-4 / rank | |||
Property / DOI | |||
Property / DOI: 10.1007/S10288-015-0297-4 / rank | |||
Normal rank |
Latest revision as of 07:57, 10 December 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | A two-stage flow shop scheduling problem with transportation considerations |
scientific article |
Statements
A two-stage flow shop scheduling problem with transportation considerations (English)
0 references
13 January 2016
0 references
scheduling
0 references
robotic flow shop
0 references
transport
0 references
two-stage
0 references
makespan
0 references
0 references
0 references
0 references
0 references