A two-stage flow shop scheduling problem with transportation considerations
From MaRDI portal
Publication:904289
DOI10.1007/s10288-015-0297-4zbMath1328.90046OpenAlexW1841996165MaRDI QIDQ904289
Rachid Benmansour, Saïd Hanafi, Moncef Abbas, Abdelghani Bekrar, Nacira Chikhi
Publication date: 13 January 2016
Published in: 4OR (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10288-015-0297-4
Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (3)
Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines ⋮ A two-stage flow shop scheduling problem with transportation considerations ⋮ New complexity results on scheduling problem in a robotic cell
Uses Software
Cites Work
- A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots
- A two-stage hybrid flow shop with dedicated machines at the first stage
- A heuristic method for two-stage hybrid flow shop with dedicated machines
- A two stage scheduling with transportation and batching
- Hybrid flowshop scheduling with interstage job transportation
- Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration
- A two-stage flow shop scheduling problem with transportation considerations
- The strong NP-hardness of two-stage flowshop scheduling with a common second-stage machine
- Two-stage flowshop scheduling with a common second-stage machine
- Group-shop scheduling with sequence-dependent set-up and transportation times
- Two-stage hybrid flow shop scheduling with dynamic job arrivals
- Parallel machine scheduling under a grade of service provision
- Scheduling a two-machine robotic cell: A solvable case
- Realistic two-stage flowshop batch scheduling problems with transportation capacity and times
- Scheduling of a Two-machine Flowshop with Travel Time Between Machines
- Two-Stage, Hybrid Flowshop Scheduling Problem
- ON EQUIVALENT-JOB FOR JOB-BLOCK IN 2×n SEQUENCING PROBLEM WITH TRANSPORTATION-TIMES
- ON AN AUTOMATED TWO-MACHINE FLOWSHOP SCHEDULING PROBLEM WITH INFINITE BUFFER
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Sequencing a hybrid two-stage flowshop with dedicated machines
- Minimizing makespan on parallel machines with release time and machine eligibility restrictions
- Machine scheduling with transportation considerations
- Makespan minimization for flow-shop problems with transportation times and a single robot
This page was built for publication: A two-stage flow shop scheduling problem with transportation considerations