A two-stage hybrid flow shop with dedicated machines at the first stage
From MaRDI portal
(Redirected from Publication:336642)
Recommendations
- On the two-stage hybrid flow shop with dedicated machines
- Sequencing a hybrid two-stage flowshop with dedicated machines
- Two-stage hybrid flow shop with recirculation
- A heuristic method for two-stage hybrid flow shop with dedicated machines
- Exact resolution of the two-stage hybrid flow shop with dedicated machines
- Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
- Minimizing total completion time in a two-stage hybrid flow shop with dedicated machines at the first stage
- A two-stage hybrid flowshop with uniform machines and setup times
- A hybrid two-stage flowshop with part family, batch production, major and minor set-ups
- A note on the two-stage hybrid flow shop problem with dedicated machines
Cites work
- A HYBRID TWO-STAGE FLOWSHOP SCHEDULING PROBLEM
- A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines
- Branch and bound algorithm for the flow shop with multiple processors
- Minimizing makespan in hybrid flowshops
- Minimizing total completion time in two-stage hybrid flow shop with dedicated machines
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
- Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
- The Complexity of Flowshop and Jobshop Scheduling
- The hybrid flow shop scheduling problem
- The strong NP-hardness of two-stage flowshop scheduling with a common second-stage machine
- Two-stage flowshop scheduling with a common second-stage machine
Cited in
(11)- Sequencing a hybrid two-stage flowshop with dedicated machines
- A new complexity proof for the two-stage hybrid flow shop scheduling problem with dedicated machines
- Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines
- On the two-stage hybrid flow shop with dedicated machines
- A two-stage flow shop scheduling problem with transportation considerations
- Minimizing makespan in hybrid flowshops
- Minimizing total completion time in a two-stage hybrid flow shop with dedicated machines at the first stage
- A heuristic method for two-stage hybrid flow shop with dedicated machines
- Minimizing total completion time in two-stage hybrid flow shop with dedicated machines
- Flow-shops with a dominant machine
- Exact resolution of the two-stage hybrid flow shop with dedicated machines
This page was built for publication: A two-stage hybrid flow shop with dedicated machines at the first stage
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q336642)