New complexity results on scheduling problem in a robotic cell
From MaRDI portal
Publication:4603936
DOI10.1051/ro/2016053zbMath1384.90042OpenAlexW2511999325MaRDI QIDQ4603936
Moncef Abbas, Nacira Chikhi, Rachid Benmansour, Saïd Hanafi
Publication date: 23 February 2018
Published in: RAIRO - Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1051/ro/2016053
Related Items
Cites Work
- A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots
- Hybrid flowshop scheduling with interstage job transportation
- Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration
- A two-stage flow shop scheduling problem with transportation considerations
- The strong NP-hardness of two-stage flowshop scheduling with a common second-stage machine
- Group-shop scheduling with sequence-dependent set-up and transportation times
- Two-stage hybrid flow shop scheduling with dynamic job arrivals
- Scheduling a two-machine robotic cell: A solvable case
- Scheduling of a Two-machine Flowshop with Travel Time Between Machines
- ON AN AUTOMATED TWO-MACHINE FLOWSHOP SCHEDULING PROBLEM WITH INFINITE BUFFER
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Machine scheduling with transportation considerations
- Makespan minimization for flow-shop problems with transportation times and a single robot