Project scheduling to minimize the makespan under flexible resource profiles and marginal diminishing returns of the resource (Q6065637): Difference between revisions

From MaRDI portal
ReferenceBot (talk | contribs)
Changed an Item
Normalize DOI.
 
Property / DOI
 
Property / DOI: 10.1016/j.cor.2023.106440 / rank
Normal rank
 
Property / DOI
 
Property / DOI: 10.1016/J.COR.2023.106440 / rank
 
Normal rank

Latest revision as of 18:06, 30 December 2024

scientific article; zbMATH DE number 7765548
Language Label Description Also known as
English
Project scheduling to minimize the makespan under flexible resource profiles and marginal diminishing returns of the resource
scientific article; zbMATH DE number 7765548

    Statements

    Project scheduling to minimize the makespan under flexible resource profiles and marginal diminishing returns of the resource (English)
    0 references
    0 references
    0 references
    0 references
    15 November 2023
    0 references
    flexible resource profiles
    0 references
    diminishing marginal returns
    0 references
    resource-constrained project
    0 references
    scheduling
    0 references

    Identifiers