Scheduling a single vehicle in the just-in-time part supply for a mixed-model assembly line (Q336585): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Normalize DOI.
 
(7 intermediate revisions by 7 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.cor.2013.05.007 / rank
Normal rank
 
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 90B35 / rank
 
Normal rank
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 90B30 / rank
 
Normal rank
Property / zbMATH DE Number
 
Property / zbMATH DE Number: 6650498 / rank
 
Normal rank
Property / zbMATH Keywords
 
vehicle scheduling
Property / zbMATH Keywords: vehicle scheduling / rank
 
Normal rank
Property / zbMATH Keywords
 
mixed-model assembly line
Property / zbMATH Keywords: mixed-model assembly line / rank
 
Normal rank
Property / zbMATH Keywords
 
part supply
Property / zbMATH Keywords: part supply / rank
 
Normal rank
Property / zbMATH Keywords
 
just-in-time
Property / zbMATH Keywords: just-in-time / rank
 
Normal rank
Property / zbMATH Keywords
 
GASA
Property / zbMATH Keywords: GASA / rank
 
Normal rank
Property / describes a project that uses
 
Property / describes a project that uses: Genocop / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2013.05.007 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2002572676 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling just-in-time part supply for mixed-model assembly lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing mixed-model assembly lines: survey, classification and model critique / rank
 
Normal rank
Property / cites work
 
Property / cites work: An MILP for scheduling problems in an FMS with one vehicle / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Orthogonal arrays. Theory and applications / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated production and material handling scheduling using mathematical programming and constraint programming / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4023071 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A bilevel decomposition algorithm for simultaneous production scheduling and conflict-free routing for automated guided vehicles / rank
 
Normal rank
Property / cites work
 
Property / cites work: Approximative procedures for no-wait job shop scheduling. / rank
 
Normal rank
Property / cites work
 
Property / cites work: An effective hybrid optimization strategy for job-shop scheduling problems / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.COR.2013.05.007 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 14:47, 9 December 2024

scientific article
Language Label Description Also known as
English
Scheduling a single vehicle in the just-in-time part supply for a mixed-model assembly line
scientific article

    Statements

    Scheduling a single vehicle in the just-in-time part supply for a mixed-model assembly line (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    10 November 2016
    0 references
    vehicle scheduling
    0 references
    mixed-model assembly line
    0 references
    part supply
    0 references
    just-in-time
    0 references
    GASA
    0 references

    Identifiers