Scheduling a single vehicle in the just-in-time part supply for a mixed-model assembly line
From MaRDI portal
Publication:336585
DOI10.1016/j.cor.2013.05.007zbMath1348.90304OpenAlexW2002572676MaRDI QIDQ336585
Meng-Chang Wang, Yun-Qing Rao, Tou-Ming Wu, Kun-Peng Wang
Publication date: 10 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2013.05.007
Related Items (5)
Packed parts delivery problem of automotive inbound logistics with a supplier park ⋮ Job scheduling of diffusion furnaces in semiconductor fabrication facilities ⋮ Scheduling just-in-time transport vehicles to feed parts for mixed model assembly lines ⋮ A multiobjective optimization algorithm to solve the part feeding problem in mixed-model assembly lines ⋮ Part logistics in the automotive industry: decision problems, literature review and research agenda
Uses Software
Cites Work
- Unnamed Item
- A bilevel decomposition algorithm for simultaneous production scheduling and conflict-free routing for automated guided vehicles
- Sequencing mixed-model assembly lines: survey, classification and model critique
- An MILP for scheduling problems in an FMS with one vehicle
- Orthogonal arrays. Theory and applications
- Approximative procedures for no-wait job shop scheduling.
- Scheduling just-in-time part supply for mixed-model assembly lines
- Integrated production and material handling scheduling using mathematical programming and constraint programming
- Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints
- Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies
- An effective hybrid optimization strategy for job-shop scheduling problems
This page was built for publication: Scheduling a single vehicle in the just-in-time part supply for a mixed-model assembly line