A note: minimizing maximum earliness on a proportionate flowshop (Q477650): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Changed an Item
Import241208061232 (talk | contribs)
Normalize DOI.
 
(5 intermediate revisions by 5 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.ipl.2014.09.023 / rank
Normal rank
 
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ipl.2014.09.023 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2062047304 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Review of the ordered and proportionate flow shop scheduling research / rank
 
Normal rank
Property / cites work
 
Property / cites work: An <i>n</i> Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Sequencing of a Single Machine Subject to Precedence Constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing total weighted completion time in a proportionate flow shop / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine scheduling to minimize the number of early and tardy jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: The just-in-time scheduling problem in a flow-shop scheduling system / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note: Maximizing the weighted number of just-in-time jobs on a proportionate flowshop / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tactically delayed versus non-delay scheduling: An experimental investigation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.IPL.2014.09.023 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 18:41, 9 December 2024

scientific article
Language Label Description Also known as
English
A note: minimizing maximum earliness on a proportionate flowshop
scientific article

    Statements

    A note: minimizing maximum earliness on a proportionate flowshop (English)
    0 references
    0 references
    0 references
    9 December 2014
    0 references
    scheduling
    0 references
    proportionate flowshop
    0 references
    minmax earliness
    0 references

    Identifiers