An EPQ model with two-component demand under fuzzy environment and Weibull distribution deterioration with shortages (Q666422): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(6 intermediate revisions by 5 users not shown)
Property / author
 
Property / author: Tripti Chakrabarti / rank
Normal rank
 
Property / author
 
Property / author: Tripti Chakrabarti / rank
 
Normal rank
Property / Wikidata QID
 
Property / Wikidata QID: Q58698798 / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1155/2012/264182 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2084514213 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Inventory Replenishment Policy for a Linear Trend in Demand—An Analytical Solution / rank
 
Normal rank
Property / cites work
 
Property / cites work: Dynamic Version of the Economic Lot Size Model / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Note on Determining Order Quantities with a Linear Trend in Demand / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Note on the Heuristic for Replenishment of Trended Inventories Considering Shortages / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3833840 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Simple Inventory Replenishment Decision Rule for a Linear Trend in Demand / rank
 
Normal rank
Property / cites work
 
Property / cites work: (T, S i ) Policy Inventory Model for Deteriorating Items with Time Proportional Demand / rank
 
Normal rank
Property / cites work
 
Property / cites work: On (T, S i ) Policy Inventory Model for Deteriorating Items with Time Proportional Demand / rank
 
Normal rank
Property / cites work
 
Property / cites work: Replenishment Schedule for Deteriorating Items with Time-Proportional Demand / rank
 
Normal rank
Property / cites work
 
Property / cites work: EOQ model for an inventory with a linear trend in demand and finite rate of replenishment considering shortages / rank
 
Normal rank
Property / cites work
 
Property / cites work: An EOQ Model for Deteriorating Items with Shortages and Time-Varying Demand / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fuzzy sets / rank
 
Normal rank
Property / cites work
 
Property / cites work: A fuzzy EOQ model with demand-dependent unit cost under limited storage capacity / rank
 
Normal rank
Property / cites work
 
Property / cites work: Economic reorder point for fuzzy backorder quantity / rank
 
Normal rank
Property / cites work
 
Property / cites work: Some inventory problems with fuzzy shortage cost / rank
 
Normal rank
Property / cites work
 
Property / cites work: A unified approach to fuzzy random variables / rank
 
Normal rank
Property / cites work
 
Property / cites work: A single-period inventory model with fuzzy demand / rank
 
Normal rank
Property / cites work
 
Property / cites work: Probabilistic single-item inventory problem with varying order cost under two linear constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5425589 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fuzzy models for single-period inventory problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3606661 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Economic production quantity for fuzzy demand quantity and fuzzy production quantity / rank
 
Normal rank
Property / cites work
 
Property / cites work: Economic order quantity in fuzzy sense for inventory without backorder model / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fuzzy probabilities. New approach and applications / rank
 
Normal rank
Property / cites work
 
Property / cites work: Uncertain probabilities. I: The discrete case / rank
 
Normal rank
Property / cites work
 
Property / cites work: Uncertain probabilities. II: The continuous case / rank
 
Normal rank
Property / cites work
 
Property / cites work: Uncertain probalities. III: The continuous case / rank
 
Normal rank
Property / cites work
 
Property / cites work: Independent fuzzy random variables and their application / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the formalization of fuzzy random variables / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4408491 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 23:06, 4 July 2024

scientific article
Language Label Description Also known as
English
An EPQ model with two-component demand under fuzzy environment and Weibull distribution deterioration with shortages
scientific article

    Statements

    An EPQ model with two-component demand under fuzzy environment and Weibull distribution deterioration with shortages (English)
    0 references
    0 references
    0 references
    8 March 2012
    0 references
    Summary: A single-item economic production model is developed in which inventory is depleted not only due to demand but also by deterioration. The rate of deterioration is taken to be time dependent, and the time to deterioration is assumed to follow a two-parameter Weibull distribution. The Weibull distribution, which is capable of representing constant, increasing, and decreasing rates of deterioration, is used to represent the distribution of the time to deterioration. In many real-life situations it is not possible to have a single rate of production throughout the production period. Items are produced at different rates during subperiods so as to meet various constraints that arise due to change in demand pattern, market fluctuations, and so forth. This paper models such a situation. Here it is assumed that demand rate is uncertain in fuzzy sense, that is, it is imprecise in nature and so demand rate is taken as triangular fuzzy number. Then by using \(\alpha\)-cut for defuzzification the total variable cost per unit time is derived. Therefore the problem is reduced to crisp average costs. The multiobjective model is solved by the global criteria method with the help of GRG (generalized reduced gradient) technique. In this model shortages are permitted and fully backordered. Numerical examples are given to illustrate the solution procedure of the two models.
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references

    Identifiers