Single machine multi-product capacitated lot sizing with sequence-dependent setups (Q5428738): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(5 intermediate revisions by 4 users not shown)
Property / author
 
Property / author: José Fernando Oliveira / rank
Normal rank
 
Property / author
 
Property / author: José Fernando Oliveira / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/00207540601094465 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1964125742 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Strong Formulations for Multi-Item Capacitated Lot Sizing / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rolling-horizon lot-sizing when set-up times are sequence-dependent / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lot sizing and scheduling -- survey and extensions / rank
 
Normal rank
Property / cites work
 
Property / cites work: A modified framework for modelling set-up carryover in the capacitated lotsizing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Tabu-Search Heuristic for the Capacitated Lot-Sizing Problem with Set-up Carryover / rank
 
Normal rank
Property / cites work
 
Property / cites work: A framework for modelling setup carryover in the capacitated lot sizing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: An effective heuristic for the CLSP with set-up times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lotsizing and Scheduling on Parallel Machines with Sequence-Dependent Setup Costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiperiod production planning carrying over set-up time / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Capacitated Lot-Sizing Problem with Linked Lot Sizes / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 12:27, 27 June 2024

scientific article; zbMATH DE number 5214360
Language Label Description Also known as
English
Single machine multi-product capacitated lot sizing with sequence-dependent setups
scientific article; zbMATH DE number 5214360

    Statements

    Single machine multi-product capacitated lot sizing with sequence-dependent setups (English)
    0 references
    0 references
    0 references
    26 November 2007
    0 references
    capacitated lot sizing and scheduling
    0 references
    sequence-dependent setup
    0 references
    integer programming
    0 references
    heuristics
    0 references

    Identifiers