Single machine multi-product capacitated lot sizing with sequence-dependent setups
From MaRDI portal
Publication:5428738
DOI10.1080/00207540601094465zbMath1126.90018OpenAlexW1964125742MaRDI QIDQ5428738
Diego Klabjan, Maria Antónia Carravilla, Bernardo Almada-Lobo, José Fernando Oliveira
Publication date: 26 November 2007
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540601094465
Integer programming (90C10) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (25)
Multiple-stage multiple-machine capacitated lot-sizing and scheduling with sequence-dependent setup: a case study in the wheel industry ⋮ Simultaneous lotsizing and scheduling problems: a classification and review of models ⋮ MIP-based heuristics for lotsizing in capacitated pure flow shop with sequence-dependent setups ⋮ Neighbourhood search meta-heuristics for capacitated lot-sizing with sequence-dependent setups ⋮ Modeling lotsizing and scheduling problems with sequence dependent setups ⋮ Lead time considerations for the multi-level capacitated lot-sizing problem ⋮ New integer optimization models and an approximate dynamic programming algorithm for the lot-sizing and scheduling problem with sequence-dependent setups ⋮ A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem ⋮ On production planning and scheduling in food processing industry:modelling non-triangular setups andproduct decay ⋮ Infeasibility handling in genetic algorithm using nested domains for production planning ⋮ The synchronized and integrated two-level lot sizing and scheduling problem: evaluating the generalized mathematical model ⋮ Integrated lot sizing and blending problems ⋮ Data-driven branching and selection for lot-sizing and scheduling problems with sequence-dependent setups and setup carryover ⋮ Design of mathematical models for the integration of purchase and production lot-sizing and scheduling problems under demand uncertainty ⋮ Multiple machine continuous setup lotsizing with sequence-dependent setups ⋮ The capacitated lot-sizing and energy efficient single machine scheduling problem with sequence dependent setup times and costs in a closed-loop supply chain network ⋮ Valid inequalities and extended formulations for lot-sizing and scheduling problem with sequence-dependent setups ⋮ Fix-and-optimize heuristics for capacitated lot-sizing with sequence-dependent setups and substitutions ⋮ A capacitated lot-sizing model with sequence-dependent setups, parallel machines and bi-part injection moulding ⋮ Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups ⋮ Single and parallel machine capacitated lotsizing and scheduling: new iterative MIP-based neighborhood search heuristics ⋮ Capacitated lot sizing and sequence dependent setup scheduling: An iterative approach for integration ⋮ Profit maximization in simultaneous lot-sizing and scheduling problem ⋮ Decomposition based heuristic algorithm for lot-sizing and scheduling problem treating time horizon as a continuum ⋮ Pricing, relaxing and fixing under lot sizing and scheduling
Cites Work
- The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
- Lot sizing and scheduling -- survey and extensions
- A Tabu-Search Heuristic for the Capacitated Lot-Sizing Problem with Set-up Carryover
- The Capacitated Lot-Sizing Problem with Linked Lot Sizes
- Lotsizing and Scheduling on Parallel Machines with Sequence-Dependent Setup Costs
- Strong Formulations for Multi-Item Capacitated Lot Sizing
- A framework for modelling setup carryover in the capacitated lot sizing problem
- Rolling-horizon lot-sizing when set-up times are sequence-dependent
- A modified framework for modelling set-up carryover in the capacitated lotsizing problem
- Multiperiod production planning carrying over set-up time
- An effective heuristic for the CLSP with set-up times
This page was built for publication: Single machine multi-product capacitated lot sizing with sequence-dependent setups