On production planning and scheduling in food processing industry:modelling non-triangular setups andproduct decay
From MaRDI portal
(Redirected from Publication:342563)
Recommendations
- Production scheduling with history-dependent setup times
- Planning and scheduling of the make-and-pack dairy production under lifetime uncertainty
- Modeling of period overlapping setup times
- Aggregate planning and scheduling in the food industry: A case study
- Optimal production scheduling for the dairy industry
Cites work
- A basic period approach to the economic lot scheduling problem with shelf life considerations
- A cutting plane approach to capacitated lot-sizing with start-up costs
- A framework for modelling setup carryover in the capacitated lot sizing problem
- A modified framework for modelling set-up carryover in the capacitated lotsizing problem
- A note on ``the capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
- Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups
- Capacitated lot-sizing with extensions: a review
- Discrete lotsizing and scheduling by batch sequencing
- HOPS -- Hamming-Oriented Partition Search for production planning in the spinning industry
- Lot sizing and scheduling -- survey and extensions
- MIP modelling of changeovers in production planning and scheduling problems
- Modeling industrial lot sizing problems: a review
- Modeling lotsizing and scheduling problems with sequence dependent setups
- Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows
- Multiperiod production planning carrying over set-up time
- On a fix-and-relax framework for a class of project scheduling problems
- On practical resource allocation for production planning and scheduling with period overlapping setups
- Optimal Ordering Policies for Perishable Inventory—II
- Planning and scheduling packaging lines in food industry
- Pricing, relaxing and fixing under lot sizing and scheduling
- Production Planning by Mixed Integer Programming
- Production scheduling and vehicle routing with time windows for perishable food products
- Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems
- Realizing block planning concepts in make-and-pack production using MILP modelling and SAP APO©
- Review of inventory systems with deterioration since 2001
- Simultaneous lotsizing and scheduling by combining local search with dual reoptimization
- Single and parallel machine capacitated lotsizing and scheduling: new iterative MIP-based neighborhood search heuristics
- Single machine multi-product capacitated lot sizing with sequence-dependent setups
- Solution approaches for the soft drink integrated production lot sizing and scheduling problem
- Solving Multi-Item Capacitated Lot-Sizing Problems Using Variable Redefinition
- Solving the discrete lotsizing and scheduling problem with sequence dependent set-up costs and set-up times using the travelling salesman problem with time windows
- Some Extensions of the Discrete Lotsizing and Scheduling Problem
- Survey of Literature on Continuously Deteriorating Inventory Models
- The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
- The capacitated lot-sizing problem with linked lot sizes
- The discrete lot-sizing and scheduling problem
- The discrete lot-sizing and scheduling problem with sequence-dependent setup costs
- The discrete lot-sizing and scheduling problem: Complexity and modification for batch availability
- The general lotsizing and scheduling problem
Cited in
(5)- A study of scheduling problem in agro-food manufacturing systems
- A computational study of the general lot-sizing and scheduling model under demand uncertainty via robust and stochastic approaches
- Classifying and modeling setups and cleanings in lot sizing and scheduling
- Hybrid matheuristics to solve the integrated lot sizing and scheduling problem on parallel machines with sequence-dependent and non-triangular setup
- Planning and scheduling of the make-and-pack dairy production under lifetime uncertainty
This page was built for publication: On production planning and scheduling in food processing industry:modelling non-triangular setups andproduct decay
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q342563)