Multiperiod production planning carrying over set-up time
From MaRDI portal
Publication:4665270
DOI10.1080/0020754021000042995zbMath1063.90022OpenAlexW1980306579MaRDI QIDQ4665270
Markku Kuula, A. P. J. Vepsäläinen, Pasi Porkka
Publication date: 9 April 2005
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/0020754021000042995
Related Items
A hybrid Lagrangian-simulated annealing-based heuristic for the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times ⋮ On production planning and scheduling in food processing industry:modelling non-triangular setups andproduct decay ⋮ A robust optimization model for multi-site production planning problem in an uncertain environment ⋮ Multiperiod competitive supply chain networks with inventorying and a transportation network equilibrium reformulation ⋮ Economic lot sizing problem with tank scheduling ⋮ Modeling industrial lot sizing problems: a review ⋮ A multiobjective stochastic production-distribution planning problem in an uncertain environment considering risk and workers productivity ⋮ Single machine multi-product capacitated lot sizing with sequence-dependent setups ⋮ Modeling of period overlapping setup times ⋮ Decomposition based heuristic algorithm for lot-sizing and scheduling problem treating time horizon as a continuum ⋮ A stochastic aggregate production planning model in a green supply chain: considering flexible lead times, nonlinear purchase and shortage cost functions