A computational study of the general lot-sizing and scheduling model under demand uncertainty via robust and stochastic approaches
From MaRDI portal
Publication:1652514
DOI10.1016/j.cor.2017.09.005zbMath1391.90007OpenAlexW2753336172MaRDI QIDQ1652514
Pedro Amorim, Eduardo Curcio, Bernardo Almada-Lobo, Douglas J. Alem
Publication date: 11 July 2018
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2017.09.005
stochastic programmingMonte Carlo simulationrobust optimizationempirical studylot sizing and scheduling problemsGLSP
Stochastic programming (90C15) Deterministic scheduling theory in operations research (90B35) Inventory, storage, reservoirs (90B05)
Related Items
New integer optimization models and an approximate dynamic programming algorithm for the lot-sizing and scheduling problem with sequence-dependent setups ⋮ Hybrid stochastic and robust optimization model for lot-sizing and scheduling problems under uncertainties ⋮ Comparison of different approaches to multistage lot sizing with uncertain demand ⋮ Multi‐level, multi‐stage lot‐sizing and scheduling in the flexible flow shop with demand information updating ⋮ Together we stand? Co-opetition for the development of green products ⋮ The robust multi-plant capacitated lot-sizing problem ⋮ A distributionally robust optimization approach for multi-product inventory decisions with budget constraint and demand and yield uncertainties ⋮ A robust optimization approach for humanitarian needs assessment planning under travel time uncertainty ⋮ Robust optimization for lot-sizing problems under yield uncertainty
Cites Work
- Unnamed Item
- Modeling lotsizing and scheduling problems with sequence dependent setups
- Mathematical programming-based approaches for multi-facility Glass container production planning
- On production planning and scheduling in food processing industry:modelling non-triangular setups andproduct decay
- The stochastic economic lot sizing problem for non-stop multi-grade production with sequence-restricted setup changeovers
- The stochastic economic lot scheduling problem: a survey
- Relax and fix heuristics to solve one-stage one-machine lot-scheduling models for small-scale soft drink plants
- MIP modelling of changeovers in production planning and scheduling problems
- The general lotsizing and scheduling problem
- Robust solutions of linear programming problems contaminated with uncertain data
- Simultaneous lotsizing and scheduling on parallel machines
- Hybrid simulated annealing and MIP-based heuristics for stochastic lot-sizing and scheduling problem in capacitated multi-stage production system
- Production planning in furniture settings via robust optimization
- Robust counterparts of inequalities containing sums of maxima of linear functions
- HOPS -- Hamming-Oriented Partition Search for production planning in the spinning industry
- Simultaneous lotsizing and scheduling problems: a classification and review of models
- Dynamic pricing and inventory control: robust vs. stochastic uncertainty models---a computational study
- Lot sizing and furnace scheduling in small foundries
- Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs
- Fix and relax heuristic for a stochastic lot-sizing problem
- Modeling with Stochastic Programming
- A Robust Optimization Approach to Inventory Theory
- The Price of Robustness