Production planning in furniture settings via robust optimization

From MaRDI portal
Publication:1761958


DOI10.1016/j.cor.2011.02.022zbMath1251.90011WikidataQ57719465 ScholiaQ57719465MaRDI QIDQ1761958

Reinaldo Morabito, Douglas J. Alem

Publication date: 15 November 2012

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.cor.2011.02.022


90B30: Production models

90-08: Computational methods for problems pertaining to operations research and mathematical programming


Related Items

Progressive Selection Method for the Coupled Lot-Sizing and Cutting-Stock Problem, A robust possibilistic programming model for a responsive closed loop supply chain network design, Robust Optimization of Sums of Piecewise Linear Functions with Application to Inventory Problems, Mathematical models and a heuristic method for the multiperiod one-dimensional cutting stock problem, Robust vertex \(p\)-center model for locating urgent relief distribution centers, Classification and literature review of integrated lot-sizing and cutting stock problems, The integrated lot sizing and cutting stock problem with saw cycle constraints applied to furniture production, A computational study of the general lot-sizing and scheduling model under demand uncertainty via robust and stochastic approaches, Production planning with order acceptance and demand uncertainty, Robust supply chain network design: an optimization model with real world application, Robust inventory control under demand and lead time uncertainty, An uncertain furniture production planning problem with cumulative service levels, Bilevel programming approaches to production planning for multiple products with short life cycles, A robust optimization approach for an integrated dynamic cellular manufacturing system and production planning with unreliable machines, Novel robust fuzzy mathematical programming methods, A robust optimization model for humanitarian relief chain design under uncertainty, Master production schedule using robust optimization approaches in an automobile second-tier supplier, Risk-averse two-stage stochastic programs in furniture plants



Cites Work