A capacitated lot-sizing model with sequence-dependent setups, parallel machines and bi-part injection moulding
From MaRDI portal
Publication:2240342
DOI10.1016/j.apm.2021.07.028zbMath1481.90028OpenAlexW3193857773MaRDI QIDQ2240342
Manuel Díaz-Madroñero, Josefa Mula, Beatriz Andres, Raquel Sanchis, Raúl Poler
Publication date: 3 November 2021
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2021.07.028
parallel machinesmixed integer linear programmingsequence-dependent setup timescapacitated lot-sizingautomotive industryinjection moulding
Cites Work
- Capacitated lot sizing with parallel machines, sequence-dependent setups, and a common setup operator
- A hybrid Lagrangian-simulated annealing-based heuristic for the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times
- Integrated cost optimization in a two-stage, automotive supply chain
- Economic lot scheduling with deliberated and controlled coproduction
- Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups
- Single and parallel machine capacitated lotsizing and scheduling: new iterative MIP-based neighborhood search heuristics
- The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
- MRP with flexible constraints: a fuzzy mathematical programming approach
- Material requirement planning with fuzzy constraints and fuzzy coefficients
- A state-of-the-art review of parallel-machine scheduling research
- Capacitated lot-sizing with extensions: a review
- A note on ``the capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
- Lot sizing and scheduling -- survey and extensions
- Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs
- Capacitated lot-sizing with sequence dependent setup costs
- A heuristic based on mathematical programming for a lot-sizing and scheduling problem in mold-injection production
- Simultaneous lotsizing and scheduling problems: a classification and review of models
- Dynamic capacitated lot-sizing problems: a classification and review of solution approaches
- The parallel machine scheduling problem with variable demand and a pre-defined lot size
- Capacitated lot-sizing and scheduling with parallel machines, back-orders, and setup carry-over
- Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up times
- Single machine multi-product capacitated lot sizing with sequence-dependent setups