Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up times

From MaRDI portal
Publication:4510521

DOI10.1080/00207540050028070zbMath0973.90512OpenAlexW2130879453MaRDI QIDQ4510521

José A. Ventura, Sanjay Radhakrishnan

Publication date: 5 December 2001

Published in: International Journal of Production Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/00207540050028070



Related Items

Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints, Minimizing total tardiness in parallel machine scheduling with setup times: an adaptive memory-based GRASP approach, Parallel machine selection and job scheduling to minimize machine cost and job tardiness, A parameter-less iterated greedy method for the hybrid flowshop scheduling problem with setup times and due date windows, Fractional factorial analysis to the configuration of simulated annealing applied to the multi-objective optimization of master production scheduling problems, Bi‐criteria formulation for green scheduling with unrelated parallel machines with sequence‐dependent setup times, Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times., A mixed integer formulation and an efficient metaheuristic for the unrelated parallel machine scheduling problem: total tardiness minimization, Scheduling Unrelated Parallel Machines with Sequence Dependent Setup Times and Weighted Earliness–Tardiness Minimization, A new and practical heuristic for Master Production Scheduling creation, Minimizing the maximal ergonomic burden in intra-hospital patient transportation, Efficient algorithms for machine scheduling problems with earliness and tardiness penalties, Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain, The significance of reducing setup times/setup costs, A survey of scheduling problems with setup times or costs, A capacitated lot-sizing model with sequence-dependent setups, parallel machines and bi-part injection moulding, Multiple machine JIT scheduling: a tabu search approach, A new multi-objective optimization method for master production scheduling problems using simulated annealing, An application of unrelated parallel machine scheduling with sequence-dependent setups at Vestel Electronics, A Meta-RaPS for the early/tardy single machine scheduling problem, Parallel machines scheduling to minimize job tardiness and machine deteriorating cost with deteriorating jobs, Parallel flowshop scheduling using Tabu search, A unified heuristic and an annotated bibliography for a large class of earliness-tardiness scheduling problems