Integrated cost optimization in a two-stage, automotive supply chain
DOI10.1016/J.COR.2015.08.012zbMATH Open1349.90111OpenAlexW1830024640MaRDI QIDQ342249FDOQ342249
Authors: Sherif A. Masoud, Scott J. Mason
Publication date: 17 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2015.08.012
Recommendations
- Collaborative planning: issues with asymmetric cost and hold-up in automotive supply chains
- Optimisation model for multi-item multi-echelon supply chains with nested multi-level products
- Synchronized two-stage lot sizing and scheduling problem in automotive industry
- A multi-objective and integrated model for supply chain scheduling optimization in a multi-site manufacturing system
- Promoting sustainability of automotive products through strategic assortment planning
Approximation methods and heuristics in mathematical programming (90C59) Applications of mathematical programming (90C90) Mixed integer programming (90C11) Transportation, logistics and supply chain management (90B06)
Cites Work
- Optimization by simulated annealing
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Metaheuristics. From design to implementation.
- An integrated approach for production and distribution planning in supply chain management
- Deterministic Production Planning: Algorithms and Complexity
- Coordinated supply chain management
- Integrated production and distribution operations: taxonomy, models, and review
- Collaborative production planning of supply chain under price and demand uncertainty
- Planning of capacities and orders in build-to-order automobile production: a review
- Mathematical programming models for supply chain production and transport planning
- Synchronized production–distribution planning in a single-plant multi-destination network
- Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches
- Optimal planning in large multi-site production networks
- Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs
- Modified simulated annealing algorithms for the flow shop sequencing problem
- Local search algorithms for the multiprocessor flow shop scheduling problem
- Multi-item dynamic production-distribution planning in process industries with divergent finishing stages
Cited In (5)
- A set-covering model for optimizing selection of portfolio of microcontrollers in an automotive supplier company
- Collaborative planning: issues with asymmetric cost and hold-up in automotive supply chains
- A capacitated lot-sizing model with sequence-dependent setups, parallel machines and bi-part injection moulding
- Supply chain planning in the German automotive industry
- Optimizing the periodic pick-up of raw materials for a manufacturer of auto parts
This page was built for publication: Integrated cost optimization in a two-stage, automotive supply chain
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q342249)