Synchronized two-stage lot sizing and scheduling problem in automotive industry
From MaRDI portal
Publication:5176352
DOI10.1007/978-3-642-29210-1_76zbMATH Open1306.90088OpenAlexW2162730720MaRDI QIDQ5176352FDOQ5176352
Authors: Fadime Üney-Yüksektepe, Rıfat Gürcan Özdemir
Publication date: 3 March 2015
Published in: Operations Research Proceedings (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-642-29210-1_76
Recommendations
- The synchronized and integrated two-level lot sizing and scheduling problem: evaluating the generalized mathematical model
- Multiple-stage multiple-machine capacitated lot-sizing and scheduling with sequence-dependent setup: a case study in the wheel industry
- Multi-population genetic algorithm to solve the synchronized and integrated two-level lot sizing and scheduling problem
- Multi-stage simultaneous lot-sizing and scheduling for flow line production
- Um modelo de otimização para o problema integrado de dimensionamento de lotes e programação da produção em fábricas de refrigerantes
Case-oriented studies in operations research (90B90) Mixed integer programming (90C11) Production models (90B30)
Cited In (4)
- Optimization framework for process scheduling of operation-dependent automobile assembly lines
- The synchronized and integrated two-level lot sizing and scheduling problem: evaluating the generalized mathematical model
- The integrated lot sizing and cutting stock problem in an automotive spring factory
- Integrated cost optimization in a two-stage, automotive supply chain
This page was built for publication: Synchronized two-stage lot sizing and scheduling problem in automotive industry
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5176352)