Optimization framework for process scheduling of operation-dependent automobile assembly lines
From MaRDI portal
Recommendations
- Scheduling of flexible flow lines in an automobile assembly plant
- Combinatorial optimization models for production scheduling in automated manufacturing systems
- scientific article; zbMATH DE number 1738680
- Capacity-constrained production scheduling of multiple vehicle programs in an automotive pilot plant
- OPTIMAL SCHEDULING FOR AN AUTOMATED m-MACHINE FLOWSHOP
- Modeling and optimization for automobile mixed assembly line in industry 4.0
- Synchronized two-stage lot sizing and scheduling problem in automotive industry
- Optimization of production planning problems -- A case study for assembly lines
- A heuristic procedure for the automobile assembly-line sequencing problem considering multiple product options
Cites work
- scientific article; zbMATH DE number 4152123 (Why is no real title available?)
- Algorithms for the car sequencing and the level scheduling problem
- An enumerative heuristic and reduction methods for the assembly line balancing problem
- An integer linear programming approach and a hybrid variable neighborhood search for the car sequencing problem
- An linear programming based lower bound for the simple assembly line balancing problem
- Improvement of earliness and lateness by postponement on an automotive production line
- Mixed integer linear programming in process scheduling: modeling, algorithms, and applications
- Modeling and analysis of build-to-order supply chains
- Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line
- Review and comparison of three methods for the solution of the car sequencing problem
- Sequencing JIT mixed-model assembly lines under station-load and part-usage constraints
- Sequencing mixed-model assembly lines: survey, classification and model critique
- The sequence-dependent assembly line balancing problem
Cited in
(3)
This page was built for publication: Optimization framework for process scheduling of operation-dependent automobile assembly lines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q691498)