Improvement of earliness and lateness by postponement on an automotive production line
From MaRDI portal
Publication:930141
DOI10.1007/S10696-007-9022-8zbMATH Open1145.90369OpenAlexW2089761050MaRDI QIDQ930141FDOQ930141
Publication date: 23 June 2008
Published in: International Journal of Flexible Manufacturing Systems (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10696-007-9022-8
Recommendations
- A decomposition approach for the car resequencing problem with selectivity banks
- Level scheduling under limited resequencing flexibility
- Analysis and design of sequencing rules for car sequencing
- Robust car sequencing for automotive assembly
- Sequencing problem for a mixed-model assembly line in the Toyota production system
SimulationJust-in-time production systemMixed-model production linePostponementPresequencingResequencing
Cites Work
- Minimizing variation of production rates in just-in-time systems: A survey
- Assembly line balancing in a mixed-model sequencing environment with synchronous transfers.
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- On the complexity of the car sequencing problem.
- Least in-sequence probability heuristic for mixed-volume production lines
- Sequencing jobs on an automobile assembly line: objectives and procedures
- Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems
Cited In (1)
This page was built for publication: Improvement of earliness and lateness by postponement on an automotive production line
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q930141)