Optimization framework for process scheduling of operation-dependent automobile assembly lines
From MaRDI portal
Publication:691498
DOI10.1007/s11590-011-0303-5zbMath1258.90044OpenAlexW1973064725MaRDI QIDQ691498
Christodoulos A. Floudas, Jie Li, Qiuhua Tang, Mingxing Deng
Publication date: 30 November 2012
Published in: Optimization Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11590-011-0303-5
mixed integer linear programmingassembly line balancingmixed-model assembly linecar sequencingcontinuous manufacturingoperation assignmentoperation process precision
Related Items (1)
Uses Software
Cites Work
- Unnamed Item
- Mixed integer linear programming in process scheduling: modeling, algorithms, and applications
- Algorithms for the car sequencing and the level scheduling problem
- Improvement of earliness and lateness by postponement on an automotive production line
- An integer linear programming approach and a hybrid variable neighborhood search for the car sequencing problem
- The sequence-dependent assembly line balancing problem
- Sequencing mixed-model assembly lines: survey, classification and model critique
- Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line
- An enumerative heuristic and reduction methods for the assembly line balancing problem
- Modeling and analysis of build-to-order supply chains
- An linear programming based lower bound for the simple assembly line balancing problem
- Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints
- Review and comparison of three methods for the solution of the car sequencing problem
This page was built for publication: Optimization framework for process scheduling of operation-dependent automobile assembly lines