OPTIMAL SCHEDULING FOR AN AUTOMATED m-MACHINE FLOWSHOP
From MaRDI portal
Publication:4366147
DOI10.15807/JORSJ.40.356zbMATH Open0894.90077OpenAlexW2112169929MaRDI QIDQ4366147FDOQ4366147
Authors: Jinliang Cheng, Yoshiyuki Karuno, Hiroshi Kise
Publication date: 7 September 1998
Published in: Journal of the Operations Research Society of Japan (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.15807/jorsj.40.356
Recommendations
- A branch-and-bound algorithm with fuzzy inference for a permutation flowshop scheduling problem
- ON AN AUTOMATED TWO-MACHINE FLOWSHOP SCHEDULING PROBLEM WITH INFINITE BUFFER
- scientific article; zbMATH DE number 2050744
- An efficient heuristic approach to the scheduling of jobs in a flowshop
- Optimal results and numerical simulations for flow shop scheduling problems
Cited In (6)
- Optimization framework for process scheduling of operation-dependent automobile assembly lines
- Multilevel intelligent scheduling and control system for an automated flow shop manufacturing environment
- Optimal four-machine flow shop scheduling with dominance condition
- Optimal scheduling of the 3-machine assembly-type flow shop
- ON AN AUTOMATED TWO-MACHINE FLOWSHOP SCHEDULING PROBLEM WITH INFINITE BUFFER
- Combinatorial optimization models for production scheduling in automated manufacturing systems
This page was built for publication: OPTIMAL SCHEDULING FOR AN AUTOMATED m-MACHINE FLOWSHOP
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4366147)