scientific article; zbMATH DE number 2050744
From MaRDI portal
Publication:4452938
zbMATH Open1051.90034MaRDI QIDQ4452938FDOQ4452938
Jinliang Cheng, George Steiner, Paul Stephenson, Hiroshi Kise
Publication date: 7 March 2004
Title of this publication is not available (Why is that?)
Recommendations
- A branch-and-bound algorithm with fuzzy inference for a permutation flowshop scheduling problem
- A Branch-and-Bound Approach for a Two-machine Flowshop Scheduling Problem
- A computational study with a new algorithm for the three-machine permutation flow-shop problem with release times
- Fast algorithms to minimize the makespan or maximum lateness in the two-machine flow shop with release times.
- A computational study of the permutation flow shop problem based on a tight lower bound
Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Cited In (7)
- A branch and bound based heuristic for multi-product resource constrained scheduling problem in FMS environment
- A computational study with a new algorithm for the three-machine permutation flow-shop problem with release times
- A branch-and-bound algorithm with fuzzy inference for a permutation flowshop scheduling problem
- Decomposition approaches in permutation scheduling problems with application to the M-machine flow shop scheduling problems
- A computationally efficient branch-and-bound algorithm for the permutation flow-shop scheduling problem
- Solving constrained flow-shop scheduling problem through multistage fuzzy binding approach with fuzzy due dates
- A heuristic method for RCPSP with fuzzy activity times
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4452938)