Optimal scheduling of the 3-machine assembly-type flow shop
From MaRDI portal
Publication:4497878
DOI10.1051/ro:1999120zbMath0961.90033OpenAlexW2015626373MaRDI QIDQ4497878
Mohamed Haouari, Thouraya Daouas
Publication date: 24 August 2000
Published in: RAIRO - Operations Research (Search for Journal in Brave)
Full work available at URL: https://eudml.org/doc/116598
Abstract computational complexity for mathematical programming problems (90C60) Deterministic scheduling theory in operations research (90B35)
Related Items
Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures, A multi-objective production scheduling case study solved by simulated annealing, Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop, A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times, A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines, Lot streaming for a two-stage assembly system in the presence of handling costs, The two-stage assembly flow shop scheduling with an availability constraint: worst case analysis, A two-stage assembly-type flowshop scheduling problem for minimizing total tardiness, Two-stage assembly scheduling problem for minimizing total tardiness with setup times, The two-stage assembly scheduling problem to minimize total completion time with setup times, Méthode heuristique pour le problème de flow shop hybride avec machines dédiées, A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application, Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times