The synchronized and integrated two-level lot sizing and scheduling problem: evaluating the generalized mathematical model

From MaRDI portal
Publication:1664892

DOI10.1155/2015/182781zbMATH Open1394.90050OpenAlexW1588119261WikidataQ57719407 ScholiaQ57719407MaRDI QIDQ1664892FDOQ1664892

C. F. M. Toledo, A. Kimms, Reinaldo Morabito, P. M. França

Publication date: 27 August 2018

Published in: Mathematical Problems in Engineering (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1155/2015/182781




Recommendations



Cites Work


Cited In (3)





This page was built for publication: The synchronized and integrated two-level lot sizing and scheduling problem: evaluating the generalized mathematical model

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1664892)