C. F. M. Toledo

From MaRDI portal
Person:1664891



List of research outcomes

This list is not complete and representing at the moment only items from zbMATH Open and arXiv. We are working on additional sources - please check back here soon!

PublicationDate of PublicationType
The synchronized and integrated two-level lot sizing and scheduling problem: evaluating the generalized mathematical model
Mathematical Problems in Engineering
2018-08-27Paper
Global optimization using a genetic algorithm with hierarchically structured population
Journal of Computational and Applied Mathematics
2014-01-08Paper
Multi-population genetic algorithm to solve the synchronized and integrated two-level lot sizing and scheduling problem
International Journal of Production Research
2010-11-07Paper
Um modelo de otimização para o problema integrado de dimensionamento de lotes e programação da produção em fábricas de refrigerantes
Pesquisa Operacional
2009-05-22Paper


Research outcomes over time


This page was built for person: C. F. M. Toledo