Capacitated lot sizing with parallel machines, sequence-dependent setups, and a common setup operator
From MaRDI portal
Publication:331763
DOI10.1007/S00291-015-0410-2zbMATH Open1352.90010OpenAlexW1251480267MaRDI QIDQ331763FDOQ331763
Authors: Horst Tempelmeier, Karina Copil
Publication date: 27 October 2016
Published in: OR Spectrum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s00291-015-0410-2
Recommendations
- Single machine multi-product capacitated lot sizing with sequence-dependent setups
- The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
- Multiple-stage multiple-machine capacitated lot-sizing and scheduling with sequence-dependent setup: a case study in the wheel industry
- Lotsizing and scheduling on parallel machines with sequence-dependent setup costs
- A capacitated lot-sizing model with sequence-dependent setups, parallel machines and bi-part injection moulding
Approximation methods and heuristics in mathematical programming (90C59) Inventory, storage, reservoirs (90B05)
Cites Work
- On practical resource allocation for production planning and scheduling with period overlapping setups
- Simultaneous lotsizing and scheduling on parallel machines
- Dynamic capacitated lot-sizing problems: a classification and review of solution approaches
- Integrating deterioration and lifetime constraints in production and supply chain planning: a survey
- Rolling-horizon lot-sizing when set-up times are sequence-dependent
- Single and parallel machine capacitated lotsizing and scheduling: new iterative MIP-based neighborhood search heuristics
- Capacitated lot-sizing with extensions: a review
- Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches
- Capacitated Multi-Item Lot-Sizing Problems with Time Windows
- Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows
- Capacitated lot sizing and sequence dependent setup scheduling: An iterative approach for integration
Cited In (13)
- A mixed-integer programming model for an integrated production planning problem with preventive maintenance in the pulp and paper industry
- Simultaneous lotsizing and scheduling considering secondary resources: a general model, literature review and classification
- A capacitated lot-sizing model with sequence-dependent setups, parallel machines and bi-part injection moulding
- Classifying and modeling setups and cleanings in lot sizing and scheduling
- Multiple-stage multiple-machine capacitated lot-sizing and scheduling with sequence-dependent setup: a case study in the wheel industry
- A survey of job shop scheduling problem: the types and models
- A sustainable inventory model to study the mixing and bottling plant of single item for cost minimization
- Capacitated lot-sizing with sequence dependent setup costs
- Simultaneous lotsizing and scheduling problems: a classification and review of models
- Worst case analysis of relax and fix heuristics for lot-sizing problems
- Alternative mathematical models and solution approaches for lot-sizing and scheduling problems in the brewery industry: analyzing two different situations
- A dynamic programming approach for the two-product capacitated lot-sizing problem with concave costs
- Editorial. Quantitative approaches in production management
This page was built for publication: Capacitated lot sizing with parallel machines, sequence-dependent setups, and a common setup operator
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q331763)