A mixed-integer programming model for an integrated production planning problem with preventive maintenance in the pulp and paper industry
From MaRDI portal
Publication:6048625
DOI10.1080/0305215x.2022.2086237zbMath1523.90135OpenAlexW4283729387MaRDI QIDQ6048625
Unnamed Author, Unnamed Author, Unnamed Author, Unnamed Author
Publication date: 11 October 2023
Published in: Engineering Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/0305215x.2022.2086237
production planningmixed integer linear programminglot-sizingpreventive maintenancepulp and paper industry
Cites Work
- Modeling lotsizing and scheduling problems with sequence dependent setups
- Capacitated lot sizing with parallel machines, sequence-dependent setups, and a common setup operator
- A hybrid VNS approach for the short-term production planning and scheduling: a case study in the pulp and paper industry
- Unequal individual genetic algorithm with intelligent diversification for the lot-scheduling problem in integrated mills using multiple-paper machines
- Multiple machine continuous setup lotsizing with sequence-dependent setups
- An integrated production and preventive maintenance planning model
- Capacitated lot sizing and sequence dependent setup scheduling: An iterative approach for integration
- Lot sizing and scheduling -- survey and extensions
- Simultaneous lotsizing and scheduling on parallel machines
- An exact optimization approach for an integrated process configuration, lot-sizing, and scheduling problem
- Simultaneous lotsizing and scheduling considering secondary resources: a general model, literature review and classification
- Classifying and modeling setups and cleanings in lot sizing and scheduling
- An MIP-based interval heuristic for the capacitated multi-level lot-sizing problem with setup times
- Multi-stage simultaneous lot-sizing and scheduling for flow line production
- Simultaneous lotsizing and scheduling problems: a classification and review of models
- The significance of reducing setup times/setup costs
- Capacitated lot sizing and scheduling with parallel machines and shared buffers: A case study in a packaging company
- Effective solution of the long-term open pit production planning problem using block clustering
This page was built for publication: A mixed-integer programming model for an integrated production planning problem with preventive maintenance in the pulp and paper industry