An integrated production and preventive maintenance planning model

From MaRDI portal
Publication:877045

DOI10.1016/J.EJOR.2006.06.032zbMath1131.90334OpenAlexW2000500586MaRDI QIDQ877045

M. A. Jamali, Daoud Ait-Kadi, El-Houssaine Aghezzaf

Publication date: 19 April 2007

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2006.06.032




Related Items (19)

Simultaneous production and maintenance planning for a single capacitated resource facing both a dynamic demand and intensive wear and tearScheduling jobs and maintenance activities on parallel machinesJoint optimization of condition-based maintenance and production lot-sizingTwo-state optimal maintenance planning of repairable systems with covariate effectsAn economic production quantity model for deteriorating items with preventive maintenance policy and random machine breakdownA new mathematical model for economic ordering with preventive maintenance and reworking in a supply chainA mixed-integer programming model for an integrated production planning problem with preventive maintenance in the pulp and paper industryJoint Optimization of Production Plan and Preventive Maintenance Schedule by Stackelberg GameThe impact of inspection errors, imperfect maintenance and minimal repairs on an imperfect production systemIntegrated condition-based maintenance and multi-item lot-sizing with stochastic demandIntegrated production planning and preventive maintenance in deteriorating production systemsAnalysis of joint maintenance and production policies under a subcontracting constraintIntegrated production planning and preventive maintenance in deteriorating production systemsEconomic production lot-sizing for an unreliable machine under imperfect age-based maintenance policyAn EMQ model in an imperfect production processA multi-objective approach to simultaneous determination of spare part numbers and preventive replacement timesRecursive operation time maximization model for the maintenance of power generation equipmentINTEGRATED PRODUCTION MAINTENANCE MODEL UNDER IMPERFECT AGE-BASED MAINTENANCE POLICY AND NON-NEGLIGIBLE MAINTENANCE TIMESA performance-centred approach to optimising maintenance of complex systems




Cites Work




This page was built for publication: An integrated production and preventive maintenance planning model