An integrated production and preventive maintenance planning model
From MaRDI portal
Publication:877045
DOI10.1016/J.EJOR.2006.06.032zbMath1131.90334OpenAlexW2000500586MaRDI QIDQ877045
M. A. Jamali, Daoud Ait-Kadi, El-Houssaine Aghezzaf
Publication date: 19 April 2007
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2006.06.032
Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30)
Related Items (19)
Simultaneous production and maintenance planning for a single capacitated resource facing both a dynamic demand and intensive wear and tear ⋮ Scheduling jobs and maintenance activities on parallel machines ⋮ Joint optimization of condition-based maintenance and production lot-sizing ⋮ Two-state optimal maintenance planning of repairable systems with covariate effects ⋮ An economic production quantity model for deteriorating items with preventive maintenance policy and random machine breakdown ⋮ A new mathematical model for economic ordering with preventive maintenance and reworking in a supply chain ⋮ A mixed-integer programming model for an integrated production planning problem with preventive maintenance in the pulp and paper industry ⋮ Joint Optimization of Production Plan and Preventive Maintenance Schedule by Stackelberg Game ⋮ The impact of inspection errors, imperfect maintenance and minimal repairs on an imperfect production system ⋮ Integrated condition-based maintenance and multi-item lot-sizing with stochastic demand ⋮ Integrated production planning and preventive maintenance in deteriorating production systems ⋮ Analysis of joint maintenance and production policies under a subcontracting constraint ⋮ Integrated production planning and preventive maintenance in deteriorating production systems ⋮ Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy ⋮ An EMQ model in an imperfect production process ⋮ A multi-objective approach to simultaneous determination of spare part numbers and preventive replacement times ⋮ Recursive operation time maximization model for the maintenance of power generation equipment ⋮ INTEGRATED PRODUCTION MAINTENANCE MODEL UNDER IMPERFECT AGE-BASED MAINTENANCE POLICY AND NON-NEGLIGIBLE MAINTENANCE TIMES ⋮ A performance-centred approach to optimising maintenance of complex systems
Cites Work
- Unnamed Item
- Unnamed Item
- Single machine flow-time scheduling with a single breakdown
- Integrating maintenance and production decisions in a hierarchical production planning environment
- Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint
- Machine scheduling with an availability constraint
- Scheduling the maintenance on a single machine
- Optimum Preventive Maintenance Policies
- Computational Complexity of the Capacitated Lot Size Problem
- Scheduling jobs and maintenance activities on parallel machines
- Deterministic Production Planning with Concave Costs and Capacity Constraints
- Two-machine flow shops with limited machine availability
This page was built for publication: An integrated production and preventive maintenance planning model