An MIP-based interval heuristic for the capacitated multi-level lot-sizing problem with setup times
From MaRDI portal
Publication:1761844
DOI10.1007/S10479-011-1026-9zbMATH Open1251.90200OpenAlexW2035405465MaRDI QIDQ1761844FDOQ1761844
Publication date: 15 November 2012
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-011-1026-9
Recommendations
- MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs
- On alternative mixed integer programming formulations and LP-based heuristics for lot-sizing with setup times
- Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic
- A relax-and-fix with fix-and-optimize heuristic applied to multi-level lot-sizing problems
- Period decompositions for the capacitated lot sizing problem with setup times
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Title not available (Why is that?)
- The Capacitated Lot-Sizing Problem with Linked Lot Sizes
- A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times
- Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic
- A heuristic for the dynamic multi-level capacitated lotsizing problem with linked lotsizes for general product structures
- An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging
- bc — prod: A Specialized Branch-and-Cut System for Lot-Sizing Problems
- Neighbourhood search meta-heuristics for capacitated lot-sizing with sequence-dependent setups
- MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs
- Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows
- Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction
- A heuristic approach for big bucket multi-level production planning problems
- Uncapacitated lot-sizing: The convex hull of solutions
- Multi-level lot-sizing problem: Evaluation of a simulated-annealing heuristic
Cited In (12)
- Predictive Search for Capacitated Multi-Item Lot Sizing Problems
- A mixed-integer programming model for an integrated production planning problem with preventive maintenance in the pulp and paper industry
- Mixed integer programming in production planning with backlogging and setup carryover: modeling and algorithms
- MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs
- A sustainable inventory model to study the mixing and bottling plant of single item for cost minimization
- The green capacitated multi-item lot sizing problem with parallel machines
- A cross entropy-lagrangean hybrid algorithm for the multi-item capacitated lot-sizing problem with setup times
- Worst case analysis of relax and fix heuristics for lot-sizing problems
- New construction heuristic for capacitated lot sizing problems
- Alternative mathematical models and solution approaches for lot-sizing and scheduling problems in the brewery industry: analyzing two different situations
- A robust optimization model for multi-product two-stage capacitated production planning under uncertainty
- On alternative mixed integer programming formulations and LP-based heuristics for lot-sizing with setup times
Uses Software
This page was built for publication: An MIP-based interval heuristic for the capacitated multi-level lot-sizing problem with setup times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1761844)