Effective solution of the long-term open pit production planning problem using block clustering
From MaRDI portal
Publication:6094355
DOI10.1080/0305215x.2020.1771703zbMath1523.90120OpenAlexW3047830706MaRDI QIDQ6094355
Unnamed Author, Unnamed Author, Unnamed Author
Publication date: 10 October 2023
Published in: Engineering Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/0305215x.2020.1771703
Applications of mathematical programming (90C90) Nonlinear programming (90C30) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30)
Related Items (1)
Cites Work
- Unnamed Item
- Aggregation heuristic for the open-pit block scheduling problem
- A clustering ensemble framework based on elite selection of weighted clusters
- The new Fundamental Tree Algorithm for production scheduling of open pit mines
- A clustering ensemble framework based on selection of fuzzy weighted clusters in a locally adaptive clustering algorithm
- Receding horizon control applied to optimal mine planning
- 10.1162/153244303321897735
This page was built for publication: Effective solution of the long-term open pit production planning problem using block clustering