The new Fundamental Tree Algorithm for production scheduling of open pit mines

From MaRDI portal
Publication:856303


DOI10.1016/j.ejor.2005.12.035zbMath1110.90033MaRDI QIDQ856303

Salih Ramazan

Publication date: 7 December 2006

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2005.12.035


90C06: Large-scale problems in mathematical programming

90B35: Deterministic scheduling theory in operations research

90B30: Production models


Related Items

Concurrent open-pit mine production and in-pit crushing–conveying system planning, A real-world mine excavators timetabling methodology in open-pit mining, Effective solution of the long-term open pit production planning problem using block clustering, An integrated approach for earthwork allocation, sequencing and routing, Optimization-based heuristics for underground mine scheduling, Long term production planning of open pit mines by ant colony optimization, Production phase and ultimate pit limit design under commodity price uncertainty, Network-flow based algorithms for scheduling production in multi-processor open-pit mines accounting for metal uncertainty, MineLib: a library of open pit mining problems, Production scheduling with uncertain supply: a new solution to the open pit mining problem, Tailored Lagrangian relaxation for the open pit block sequencing problem, A sliding time window heuristic for open pit mine block sequencing, A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines, LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity, A new MIP model for mine equipment scheduling by minimizing maintenance cost, A local branching heuristic for the open pit mine production scheduling problem, Optimizing the open pit-to-underground mining transition, Linear models for stockpiling in open-pit mine production scheduling problems, Optimizing a mineral value chain with market uncertainty using Benders decomposition, A diversified tabu search approach for the open-pit mine production scheduling problem with metal uncertainty, Constructing branching trees of geostatistical simulations, Hierarchical Benders Decomposition for Open-Pit Mine Block Sequencing, A MIXED-INTEGER LINEAR PROGRAMMING (MILP) MODEL FOR SHORT-RANGE PRODUCTION SCHEDULING OF CEMENT QUARRY OPERATIONS



Cites Work