The new Fundamental Tree Algorithm for production scheduling of open pit mines

From MaRDI portal
Publication:856303

DOI10.1016/j.ejor.2005.12.035zbMath1110.90033OpenAlexW1972121892MaRDI QIDQ856303

Salih Ramazan

Publication date: 7 December 2006

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2005.12.035




Related Items (23)

An integrated approach for earthwork allocation, sequencing and routingOptimization-based heuristics for underground mine schedulingLong term production planning of open pit mines by ant colony optimizationConcurrent open-pit mine production and in-pit crushing–conveying system planningProduction phase and ultimate pit limit design under commodity price uncertaintyNetwork-flow based algorithms for scheduling production in multi-processor open-pit mines accounting for metal uncertaintyMineLib: a library of open pit mining problemsA diversified tabu search approach for the open-pit mine production scheduling problem with metal uncertaintyA hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit minesConstructing branching trees of geostatistical simulationsA real-world mine excavators timetabling methodology in open-pit miningProduction scheduling with uncertain supply: a new solution to the open pit mining problemEffective solution of the long-term open pit production planning problem using block clusteringTailored Lagrangian relaxation for the open pit block sequencing problemA local branching heuristic for the open pit mine production scheduling problemOptimizing the open pit-to-underground mining transitionLinear models for stockpiling in open-pit mine production scheduling problemsLP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivityOptimizing a mineral value chain with market uncertainty using Benders decompositionA sliding time window heuristic for open pit mine block sequencingA MIXED-INTEGER LINEAR PROGRAMMING (MILP) MODEL FOR SHORT-RANGE PRODUCTION SCHEDULING OF CEMENT QUARRY OPERATIONSA new MIP model for mine equipment scheduling by minimizing maintenance costHierarchical Benders Decomposition for Open-Pit Mine Block Sequencing



Cites Work


This page was built for publication: The new Fundamental Tree Algorithm for production scheduling of open pit mines