The new Fundamental Tree Algorithm for production scheduling of open pit mines
From MaRDI portal
Publication:856303
DOI10.1016/j.ejor.2005.12.035zbMath1110.90033OpenAlexW1972121892MaRDI QIDQ856303
Publication date: 7 December 2006
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2005.12.035
Large-scale problems in mathematical programming (90C06) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Related Items (23)
An integrated approach for earthwork allocation, sequencing and routing ⋮ Optimization-based heuristics for underground mine scheduling ⋮ Long term production planning of open pit mines by ant colony optimization ⋮ Concurrent open-pit mine production and in-pit crushing–conveying system planning ⋮ Production phase and ultimate pit limit design under commodity price uncertainty ⋮ Network-flow based algorithms for scheduling production in multi-processor open-pit mines accounting for metal uncertainty ⋮ MineLib: a library of open pit mining problems ⋮ A diversified tabu search approach for the open-pit mine production scheduling problem with metal uncertainty ⋮ A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines ⋮ Constructing branching trees of geostatistical simulations ⋮ A real-world mine excavators timetabling methodology in open-pit mining ⋮ Production scheduling with uncertain supply: a new solution to the open pit mining problem ⋮ Effective solution of the long-term open pit production planning problem using block clustering ⋮ Tailored Lagrangian relaxation for the open pit block sequencing problem ⋮ A local branching heuristic for the open pit mine production scheduling problem ⋮ Optimizing the open pit-to-underground mining transition ⋮ Linear models for stockpiling in open-pit mine production scheduling problems ⋮ LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity ⋮ Optimizing a mineral value chain with market uncertainty using Benders decomposition ⋮ A sliding time window heuristic for open pit mine block sequencing ⋮ A MIXED-INTEGER LINEAR PROGRAMMING (MILP) MODEL FOR SHORT-RANGE PRODUCTION SCHEDULING OF CEMENT QUARRY OPERATIONS ⋮ A new MIP model for mine equipment scheduling by minimizing maintenance cost ⋮ Hierarchical Benders Decomposition for Open-Pit Mine Block Sequencing
Cites Work
This page was built for publication: The new Fundamental Tree Algorithm for production scheduling of open pit mines