A new MIP model for mine equipment scheduling by minimizing maintenance cost
From MaRDI portal
Publication:992721
DOI10.1016/j.ejor.2010.05.037zbMath1206.90078OpenAlexW1984531135MaRDI QIDQ992721
Publication date: 9 September 2010
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2010.05.037
mine equipment schedulingminimizing cost in mining equipmentsMIP for truck schedulingtruck maintenance scheduling
Related Items (9)
Production-driven opportunistic maintenance for batch production based on MAM-APB scheduling ⋮ A survey on scheduling problems with due windows ⋮ Dynamic maintenance decision-making for series-parallel manufacturing system based on MAM-MTW methodology ⋮ A diversified tabu search approach for the open-pit mine production scheduling problem with metal uncertainty ⋮ A real-world mine excavators timetabling methodology in open-pit mining ⋮ A multiple objective transportation problem approach to dynamic truck dispatching in surface mines ⋮ Stochastic short-term mine production schedule accounting for fleet allocation, operational considerations and blending restrictions ⋮ Optimizing the open pit-to-underground mining transition ⋮ An MILP approach to multi-location, multi-period equipment selection for surface mining with case studies
Uses Software
Cites Work
- The new Fundamental Tree Algorithm for production scheduling of open pit mines
- An MILP for scheduling problems in an FMS with one vehicle
- MIP modelling of changeovers in production planning and scheduling problems
- Staff scheduling and rostering: a review of applications, methods and models.
- Integration of equipment planning and project scheduling
- Scheduling
This page was built for publication: A new MIP model for mine equipment scheduling by minimizing maintenance cost