Stochastic short-term mine production schedule accounting for fleet allocation, operational considerations and blending restrictions
DOI10.1016/j.ejor.2016.05.050zbMath1394.90451OpenAlexW2442958018MaRDI QIDQ1752139
Roussos Dimitrakopoulos, Martha E. Villalba Matamoros
Publication date: 24 May 2018
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2016.05.050
Integer programming (90C10) Stochastic programming (90C15) Approximation methods and heuristics in mathematical programming (90C59) Stochastic scheduling theory in operations research (90B36) Case-oriented studies in operations research (90B90) Discrete location and assignment (90B80)
Related Items (6)
Cites Work
- Production scheduling with uncertain supply: a new solution to the open pit mining problem
- A hybrid heuristic algorithm for the open-pit-mining operational planning problem
- A new MIP model for mine equipment scheduling by minimizing maintenance cost
- A diversified tabu search approach for the open-pit mine production scheduling problem with metal uncertainty
- Introduction to Stochastic Programming
This page was built for publication: Stochastic short-term mine production schedule accounting for fleet allocation, operational considerations and blending restrictions