Rolling-horizon lot-sizing when set-up times are sequence-dependent
From MaRDI portal
Publication:4510524
DOI10.1080/00207540050028106zbMath0973.90517OpenAlexW2089578377MaRDI QIDQ4510524
Simon J. Clark, Alistair Richard Clark
Publication date: 5 December 2001
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540050028106
Mixed integer programming (90C11) Approximation methods and heuristics in mathematical programming (90C59) Operations research and management science (90B99)
Related Items
Simultaneous lotsizing and scheduling problems: a classification and review of models ⋮ MIP-based heuristics for lotsizing in capacitated pure flow shop with sequence-dependent setups ⋮ Neighbourhood search meta-heuristics for capacitated lot-sizing with sequence-dependent setups ⋮ Modeling lotsizing and scheduling problems with sequence dependent setups ⋮ Motivations and analysis of the capacitated lot-sizing problem with setup times and minimum and maximum ending inventories ⋮ Capacitated lot sizing with parallel machines, sequence-dependent setups, and a common setup operator ⋮ Scheduling wine bottling operations with multiple lines and sequence-dependent set-up times: robust formulation and a decomposition solution approach ⋮ The synchronized and integrated two-level lot sizing and scheduling problem: evaluating the generalized mathematical model ⋮ Hybrid simulated annealing and MIP-based heuristics for stochastic lot-sizing and scheduling problem in capacitated multi-stage production system ⋮ Rolling horizon-based heuristics for solving a production-routing problem with price-dependent demand ⋮ Multi‐level, multi‐stage lot‐sizing and scheduling in the flexible flow shop with demand information updating ⋮ The capacitated lot-sizing and energy efficient single machine scheduling problem with sequence dependent setup times and costs in a closed-loop supply chain network ⋮ Relax-and-fix heuristics applied to a real-world lot sizing and scheduling problem in the personal care consumer goods industry ⋮ Model and metaheuristics for a scheduling problem integrating procurement, sale and distribution decisions ⋮ Modeling industrial lot sizing problems: a review ⋮ Exact solution approaches for the discrete lot-sizing and scheduling problem with parallel resources ⋮ A heuristic for single-warehouse multiretailer supply chains with all-unit transportation cost discounts ⋮ Combinação de abordagens GLSP e ATSP para o problema de dimensionamento e sequenciamento de lotes de produção de suplementos para nutrição animal ⋮ Production setup-sequencing and lot-sizing at an animal nutrition plant through ATSP subtour elimination and patching ⋮ Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs ⋮ Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups ⋮ Single machine multi-product capacitated lot sizing with sequence-dependent setups ⋮ Capacitated lot sizing and sequence dependent setup scheduling: An iterative approach for integration ⋮ Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs ⋮ Multi-population genetic algorithm to solve the synchronized and integrated two-level lot sizing and scheduling problem ⋮ Interdependent integrated network design and scheduling problems with movement of machines ⋮ Fix and relax heuristic for a stochastic lot-sizing problem ⋮ Decomposition based heuristic algorithm for lot-sizing and scheduling problem treating time horizon as a continuum ⋮ Um modelo de otimização para o problema integrado de dimensionamento de lotes e programação da produção em fábricas de refrigerantes ⋮ COMBINING PROCESS SELECTION AND LOT SIZING MODELS FOR PRODUCTION SCHEDULING OF ELECTROFUSED GRAINS ⋮ Worst case analysis of relax and fix heuristics for lot-sizing problems ⋮ A decomposition approach for the general lotsizing and scheduling problem for parallel production lines
This page was built for publication: Rolling-horizon lot-sizing when set-up times are sequence-dependent