Rolling-horizon lot-sizing when set-up times are sequence-dependent

From MaRDI portal
Publication:4510524

DOI10.1080/00207540050028106zbMath0973.90517OpenAlexW2089578377MaRDI QIDQ4510524

Simon J. Clark, Alistair Richard Clark

Publication date: 5 December 2001

Published in: International Journal of Production Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/00207540050028106




Related Items

Simultaneous lotsizing and scheduling problems: a classification and review of modelsMIP-based heuristics for lotsizing in capacitated pure flow shop with sequence-dependent setupsNeighbourhood search meta-heuristics for capacitated lot-sizing with sequence-dependent setupsModeling lotsizing and scheduling problems with sequence dependent setupsMotivations and analysis of the capacitated lot-sizing problem with setup times and minimum and maximum ending inventoriesCapacitated lot sizing with parallel machines, sequence-dependent setups, and a common setup operatorScheduling wine bottling operations with multiple lines and sequence-dependent set-up times: robust formulation and a decomposition solution approachThe synchronized and integrated two-level lot sizing and scheduling problem: evaluating the generalized mathematical modelHybrid simulated annealing and MIP-based heuristics for stochastic lot-sizing and scheduling problem in capacitated multi-stage production systemRolling horizon-based heuristics for solving a production-routing problem with price-dependent demandMulti‐level, multi‐stage lot‐sizing and scheduling in the flexible flow shop with demand information updatingThe capacitated lot-sizing and energy efficient single machine scheduling problem with sequence dependent setup times and costs in a closed-loop supply chain networkRelax-and-fix heuristics applied to a real-world lot sizing and scheduling problem in the personal care consumer goods industryModel and metaheuristics for a scheduling problem integrating procurement, sale and distribution decisionsModeling industrial lot sizing problems: a reviewExact solution approaches for the discrete lot-sizing and scheduling problem with parallel resourcesA heuristic for single-warehouse multiretailer supply chains with all-unit transportation cost discountsCombinação de abordagens GLSP e ATSP para o problema de dimensionamento e sequenciamento de lotes de produção de suplementos para nutrição animalProduction setup-sequencing and lot-sizing at an animal nutrition plant through ATSP subtour elimination and patchingRolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costsCapacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setupsSingle machine multi-product capacitated lot sizing with sequence-dependent setupsCapacitated lot sizing and sequence dependent setup scheduling: An iterative approach for integrationScheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costsMulti-population genetic algorithm to solve the synchronized and integrated two-level lot sizing and scheduling problemInterdependent integrated network design and scheduling problems with movement of machinesFix and relax heuristic for a stochastic lot-sizing problemDecomposition based heuristic algorithm for lot-sizing and scheduling problem treating time horizon as a continuumUm modelo de otimização para o problema integrado de dimensionamento de lotes e programação da produção em fábricas de refrigerantesCOMBINING PROCESS SELECTION AND LOT SIZING MODELS FOR PRODUCTION SCHEDULING OF ELECTROFUSED GRAINSWorst case analysis of relax and fix heuristics for lot-sizing problemsA decomposition approach for the general lotsizing and scheduling problem for parallel production lines




This page was built for publication: Rolling-horizon lot-sizing when set-up times are sequence-dependent