The capacitated lot-sizing and energy efficient single machine scheduling problem with sequence dependent setup times and costs in a closed-loop supply chain network
DOI10.1007/S10479-022-04783-4zbMath1516.90024OpenAlexW4281811193MaRDI QIDQ6099414
Flavio Tonelli, Davide Giglio, Melissa Demartini, Abdolreza Roshani, Massimo Paolucci, Maxim A. Dulebenets
Publication date: 20 June 2023
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://portal.findresearcher.sdu.dk/da/publications/1554dd2f-0a3d-480a-99a8-9fb5997737d9
single machine schedulingremanufacturingenergy-efficient schedulingcapacitated dynamic lot sizing problemgrey wolf optimizationrelax-and-fix matheuristic
Mixed integer programming (90C11) Transportation, logistics and supply chain management (90B06) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30) Inventory, storage, reservoirs (90B05)
Cites Work
- Modeling lotsizing and scheduling problems with sequence dependent setups
- The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
- Lot sizing and scheduling -- survey and extensions
- Simultaneous lotsizing and scheduling problems: a classification and review of models
- Dynamic Version of the Economic Lot Size Model
- Neighbourhood search meta-heuristics for capacitated lot-sizing with sequence-dependent setups
- Dynamic lot sizing with product returns and remanufacturing
- Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows
- Computational Complexity of the Capacitated Lot Size Problem
- Rolling-horizon lot-sizing when set-up times are sequence-dependent
- Single machine multi-product capacitated lot sizing with sequence-dependent setups
This page was built for publication: The capacitated lot-sizing and energy efficient single machine scheduling problem with sequence dependent setup times and costs in a closed-loop supply chain network