Model and metaheuristics for a scheduling problem integrating procurement, sale and distribution decisions
DOI10.1007/S10479-017-2498-ZzbMATH Open1380.90132OpenAlexW2609879193MaRDI QIDQ1698296FDOQ1698296
Authors: Simon Thevenin, Nicolas Zufferey, Rémy Glardon
Publication date: 15 February 2018
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-017-2498-z
Recommendations
- A variable neighborhood decomposition search method for supply chain management planning problems
- Supply chain scheduling with open-shop problem
- Integrated production and distribution scheduling in supply chain management
- A fuzzy goal programming and meta heuristic algorithms for solving integrated production: distribution planning problem
- Integrating purchase and production planning. Using local search in supply chain optimization
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- A heuristic for nonlinear global optimization
- Optimizing production and transportation in a commit-to-delivery business mode
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Integrated production and distribution scheduling with committed delivery dates
- Bounded single-machine parallel-batch scheduling with release dates and rejection
- A PTAS for parallel batch scheduling with rejection and dynamic job arrivals
- The unbounded parallel batch machine scheduling with release dates and rejection to minimize makespan
- Variable neighborhood search
- Production and transport logistics scheduling with two transport mode choices
- Handbook of metaheuristics
- Preemptive multiprocessor scheduling with rejection
- Production scheduling with supply and delivery considerations to minimize the makespan
- Simultaneous lotsizing and scheduling on parallel machines
- The integrated production-inventory-distribution-routing problem
- Rolling-horizon lot-sizing when set-up times are sequence-dependent
- Supply chain management and advanced planning -- basics, overview and challenges
- Integrated production and distribution planning in the fast moving consumer goods industry: A block planning application
- Workload based order acceptance in job shop environments
- Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches
- Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs
- Scheduling on parallel identical machines with job-rejection and position-dependent processing times
- A variable neighborhood search heuristic for the design of multicommodity production-distribution networks with alternative facility configurations
- Preemptive and non-preemptive on-line algorithms for scheduling with rejection on two uniform machines
- Parallel-machine scheduling with deteriorating jobs and rejection
- Title not available (Why is that?)
- Title not available (Why is that?)
- Machine scheduling with pickup and delivery
- Learning variable neighborhood search for a scheduling problem with time windows and rejections
Cited In (6)
- Tabu search for a parallel-machine scheduling problem with periodic maintenance, job rejection and weighted sum of completion times
- Minimization of maximum lateness on parallel machines with a single server and job release dates
- Reducing the supply-chain nervosity thanks to flexible planning
- Dynamic scheduling of a picking robot with limited buffer and rejection: an industrial case study
- Integrating purchase and production planning. Using local search in supply chain optimization
- Modeling the planning and scheduling across the outsourcing supply chain: a Chaos-based fast Tabu–SA approach
This page was built for publication: Model and metaheuristics for a scheduling problem integrating procurement, sale and distribution decisions
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1698296)