Improved hybrid simulated annealing algorithm for navigation scheduling for the two dams of the Three Gorges Project (Q950037): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Added link to MaRDI item.
links / mardi / namelinks / mardi / name
 

Revision as of 19:28, 30 January 2024

scientific article
Language Label Description Also known as
English
Improved hybrid simulated annealing algorithm for navigation scheduling for the two dams of the Three Gorges Project
scientific article

    Statements

    Improved hybrid simulated annealing algorithm for navigation scheduling for the two dams of the Three Gorges Project (English)
    0 references
    0 references
    0 references
    0 references
    22 October 2008
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    simulated annealing
    0 references
    local search
    0 references
    mixed-integer nonlinear programming
    0 references
    optimal navigation co-scheduling
    0 references
    Three Gorges Project
    0 references