Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case (Q864823): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
Import240304020342 (talk | contribs)
Set profile property.
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank

Revision as of 01:25, 5 March 2024

scientific article
Language Label Description Also known as
English
Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case
scientific article

    Statements

    Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case (English)
    0 references
    0 references
    13 February 2007
    0 references
    flexible flow line
    0 references
    lot scheduling
    0 references
    metaheuristics
    0 references
    finite horizon
    0 references
    limited intermediate buffers
    0 references

    Identifiers